Duration – construction time plus [15] years operating time (3.1), with the possibility of extension by mutual agreement [these complete renovation works must be verified with local public procurement rules] Interconnections are the subject of a separate agreement. Electricity Board plans and builds a transfer line from Facility to Grid Point at the seller`s expense and expense [IPPs are often asked to pay for such transportation costs and, given the very nature of the buyer and seller, the absence of sophisticated cost control mechanisms is not necessarily inappropriate in these circumstances. However, PPIs could pose problems with this provision and seek some kind of cost-sharing, at least] and be exploited and maintained by Electricity Board (4.7). ] Long-term project of an electricity purchase contract (PPA) of the Electricity Regulatory Commission (CERC) (for projects where location and fuel are indicated) (pdf) – draft electricity purchase contract developed by CERC for the Indian PIP market – for long-term agreements (more than 7 years) for the construction of power plants in which the location or fuel is not specified. A link is the draft request for submissions – for the ppA project, you go to page 70. A Power Purchase Agreement (AAE) establishes the contract between two parties: (a) the seller who produces electricity and; b) the buyer who wants to buy electricity. It defines all the terms of sale between the two. An AEA provides payment flow for a build-own transfer (BOT) or a concession project for an independent power plant (PPI). It is between the buyer (often a state electricity supplier) and a private electricity producer. 15.5 – In the event of termination due to the seller`s default, Utility has the option to acquire complex for a higher portion of the fully depreciated value of the complex and the remaining service of the debt in the context of credit documents (deducted from liquidated damages or other accrued damages). Electricity purchase contract (AAE) for small rural energy projects as part of a series of documents developed by international law firms for use in small rural energy projects.

Documents prepared for the country in Southeast Asia. Transfer of the facility to the purchaser in certain circumstances at the time of termination of the contract (10.4) with payment of the amount provided for in Pacificorp`s 10.4.2 Power Purchase Agreement (PPA) for large power plants (pdf) – Pacificorp`s proposed power purchase contract for power plants with a net power of more than 1000 kilowatts – relatively short agreement.